Vertex CRM logo
Production

Everything the crew needs, in one packet

Build a crew field-handoff packet with the scope, schedule, and site photos — then generate one bundled PDF that merges in the material order and the roof measurement report.

See pricing
  • Scope checklist + notes
  • Compressed jobsite photos
  • Linked material order + report
  • Bundled multi-doc PDF

A complete handoff for the crew

Work orders capture the customer and site, crew and schedule, a scope summary and checklist, and special-instructions, access, and safety notes. Link the job's material order and its roof measurement report right on the order so the field has the full picture before they arrive.

  • Crew, schedule, and scope checklist
  • Access + safety notes
  • Linked material order + measurement report

Photos and one bundled PDF

Add jobsite photos from the device — compressed automatically — or pull them from the job's attachments into a separate storage path so deletes never orphan the original. Then generate one bundled PDF: the work order, the price-free material order pages, and the roof measurement report, merged into a single document the crew can carry.

  • Device photos, auto-compressed
  • Copy from job attachments safely
  • Merged WO + PO + roof report PDF

Ready to put Work Orders to work?

Every feature is included in one plan — start free for 14 days.